Rwanda National Manpower Survey 2011-2012
National Institute of Statistics of Rwanda (NISR)
The Manpower Survey project was initiated by the Ministry of Public Service and Labour and the National Institute of Statistics following a meeting of Ministers in charge of labour in East Africa Community (EAC) countries that took place in Kampala in 2006. The objective of this meeting was to prepare a protocol of free labour movement in the region and the establishment of the Common Market Protocol (CMP). The meeting urged Partner States to undertake a Manpower Survey. The purpose of these surveys is to establish a better understanding of their respective labour markets as essential prerequisite for implementing the CMP in a successful and efficient manner. For reasons of comparability it was agreed to conduct these national manpower surveys in a harmonised way in all EAC member states.
How to get the data
The TDO shows no live figures for this dataset. This is the route to the data at its publisher.
Public use microdata: register for a free account, then download.
- Open the study's Get Microdata page, sign in or register for a free account, accept the terms of use, then download.
- Conditions as published: Public use files: log in or register for a free account on the catalogue, then download. Conditions: Public use files, accessible to all
- The data ↗Needs a free account or an application
- The publisher's page ↗Web page
The 17 fields of the MVP definition
The minimum metadata fields of the TDO MVP Definition v2, section 4, in its order. The prototype holds 17 of them. Which are mandatory is for the Swiss FSO and the I14Y team to settle.
| No. | Field | Value | Where it came from |
|---|---|---|---|
| F1 | Title | Rwanda National Manpower Survey 2011-2012 | As published |
| F2 | Abstract / Description | The Manpower Survey project was initiated by the Ministry of Public Service and Labour and the National Institute of Statistics following a meeting of Ministers in charge of labour in East Africa Community (EAC) countries that took place in Kampala in 2006. The objective of this meeting was to prepare a protocol of free labour movement in the region and the establishment of the Common Market… | As published |
| F3 | Keywords / Thematic Tags | Microdata, Public use files | As published |
| F4 | Semantic Topic Tag (from a controlled vocabulary) | Missing | Missing |
| F5 | Unique Identifier | rwa-nisr-rnms-2011-2012-v1 | As published |
| F6 | Publisher / Data Provider | National Institute of Statistics of Rwanda (NISR) | As published |
| F7 | Date of Publication / Last Update | 22 Jun 2026 | As published |
| F8 | Source or Origin | Sample survey data | As published |
| F9 | Access URL | https://microdatabk.statistics.gov.rw/catalog/48/get-microdata Needs a free account or an application | As published |
| F10 | Contact Information | claude.nyirimanzi@statistics.gov.rw | As published |
| F11 | Format / Type | Missing | Missing |
| F12 | Geographical Coverage | Rwanda | As published |
| F13 | Temporal Coverage | 2011-2012 | As published |
| F14 | Units of measurement | Missing | Missing |
| F15 | Variable name/label/short description | 1,909 variables, the first 100 shown
| As published |
| F16 | Update Frequency | Missing | Missing |
| F17 | Data Quality Note / Methodology Summary | In the process of metadata creation for this survey the following data issues were raised: A Diaspora module was used to collect information on the technical and entrepreneurial skills of Rwandans abroad as well as the likelihood, obstacles and opportunities to harness this potential. However, coverage for this module was not extensive enough to create a useful dataset. | As published |
The TDO's own fields
| No. | Field | Value | Where it came from |
|---|---|---|---|
| T1 | Link to source | https://microdatabk.statistics.gov.rw/catalog/48 Web page | As published |
| T2 | Licence | Public use files: log in or register for a free account on the catalogue, then download. Conditions: Public use files, accessible to all | As published |
| T3 | Original producer | Not stated | Not stated |
| T4 | Original language | en | As published |
Curation and history
| Catalogue | NISR Data Catalog (microdata), National Institute of Statistics of Rwanda (NISR) |
| Identifier at source | rwa-nisr-rnms-2011-2012-v1 |
| Stable address | https://tdo-prototype.vercel.app/dataset/nisr-b6313614bb |
| First harvested | 13 Oct 2026 |
| Last seen at source | 24 Nov 2026 |
| Version | 2 (changes captured 12 Nov 2026, 13 Oct 2026) |
Status ladder: harvested, then validated once all 17 fields are filled, then confirmed by the publisher. Confirmation comes with contributor accounts in the real build.
The metadata as the source publishes it
{
"study": {
"id": "48",
"doi": null,
"url": "https://microdatabk.statistics.gov.rw/catalog/48",
"idno": "rwa-nisr-rnms-2011-2012-v1",
"type": "survey",
"title": "Rwanda National Manpower Survey 2011-2012",
"nation": "Rwanda",
"changed": "2026-06-22T14:20:25+00:00",
"created": "2014-02-21T18:46:29+00:00",
"link_da": "",
"abstract": "The Manpower Survey project was initiated by the Ministry of Public Service and Labour and the National Institute of Statistics following a meeting of Ministers in charge of labour in East Africa Community (EAC) countries that took place in Kampala in 2006. The objective of this meeting was to prepare a protocol of free labour movement in the region and the establishment of the Common Market Protocol (CMP). The meeting urged Partner States to undertake a Manpower Survey. The purpose of these sur",
"subtitle": null,
"varcount": "1909",
"year_end": "2012",
"thumbnail": null,
"form_model": "public",
"repo_title": null,
"year_start": "2011",
"total_views": "1525658",
"ts_db_title": null,
"repositoryid": "central",
"ts_frequency": null,
"data_class_id": null,
"ts_data_count": "0",
"ts_dimensions": null,
"ts_db_study_id": null,
"total_downloads": "38800",
"authoring_entity": "National Institute of Statistics of Rwanda"
},
"record": {
"id": "48",
"doi": null,
"idno": "rwa-nisr-rnms-2011-2012-v1",
"type": "survey",
"title": "Rwanda National Manpower Survey 2011-2012",
"formid": "2",
"nation": "Rwanda",
"changed": "2026-06-22T14:20:25+00:00",
"created": "2014-02-21T18:46:29+00:00",
"abstract": "The Manpower Survey project was initiated by the Ministry of Public Service and Labour and the National Institute of Statistics following a meeting of Ministers in charge of labour in East Africa Community (EAC) countries that took place in Kampala in 2006. The objective of this meeting was to prepare a protocol of free labour movement in the region and the establishment of the Common Market Protocol (CMP). The meeting urged Partner States to undertake a Manpower Survey. The purpose of these sur",
"metadata": {
"doc_desc": {
"idno": "ddi-rwa-nisr-rphc-2012-v1",
"title": "rwa-nisr-rnms-2011-2012-v1",
"prod_date": "2014-02-21",
"producers": [
{
"abbr": "NISR",
"name": "National Institute of Statistics of Rwanda",
"role": "Metadata producer",
"affiliation": "Ministry of Finance and Economic Planning"
}
],
"version_statement": {
"version": "Version 1"
}
},
"schematype": "survey",
"study_desc": {
"oth_id": [
{
"name": "Ministry of East African Community (MINEAC)",
"role": "Coordination of the Diaspora module",
"email": "",
"affiliation": ""
}
],
"study_info": {
"notes": "The Manpower Survey includes the 3 following modules: Informal sector module, Formal Sector module, Educational institutions module, and a Diaspora module.\n\n1. The Informal Sector Module: \n1.1 The first sub-module of the Informal sector module is the Employer's sub-Module to collect information on establishments \n1.2 The second sub-module is the Employees' sub-Module which provides detailed information on employees in the informal sector. \n\n2. The Formal Sector Module: \nThis module collected data on employers and employment in public and private establishments of the formal sector. Politicians, military and Police forces were not considered as employees. \nThis module comprises two sub-modules: \n2.1 The Employer's sub-module : To collect information on Establishment characteristics , employment characteristics, total number of posts and number of filled posts, total gross remuneration, number and type of vacant posts and future manpower projections and staff development \n2.2 The Employee sub-module: To collect information of employees from the sampled public and private establishments in formal sector. \n\n3. The Education and training institutions module: To collect information on labour, current and future enrolment and training output. It covers both Public and Private Institutions in Primary and Secondary Schools; Technical and Vocational Training Schools and Tertiary institutions / Universities. \n\nA Diaspora module was used to collect information on the technical and entrepreneurial skills of Rwandans abroad as well as the likelihood, obstacles and opportunities to harness this potential. However, coverage for this module was not extensive enough to create a useful dataset. \n\nA further module - an Unemployement for skilled persons module - was planned but not initiated.",
"nation": [
{
"name": "Rwanda",
"abbreviation": "RWA"
}
],
"abstract": "The Manpower Survey project was initiated by the Ministry of Public Service and Labour and the National Institute of Statistics following a meeting of Ministers in charge of labour in East Africa Community (EAC) countries that took place in Kampala in 2006. The objective of this meeting was to prepare a protocol of free labour movement in the region and the establishment of the Common Market Protocol (CMP). \nThe meeting urged Partner States to undertake a Manpower Survey. The purpose of these surveys is to establish a better understanding of their respective labour markets as essential prerequisite for implementing the CMP in a successful and efficient manner. For reasons of comparability it was agreed to conduct these national manpower surveys in a harmonised way in all EAC member states.",
"universe": "The universe for the Formal Sector module included four distinct universes: \nPrivate Business establishments which belong to formal sector; Public and private health facilities; Non-Governmental organizations; and Public/ governmental institutions. \nThe Educational institutions module covered Primary and Secondary schools, TVET, Universities and other Tertiary educational institutions.",
"data_kind": "Sample survey data [ssd]",
"coll_dates": [
{
"end": "2011-10-28",
"cycle": "Education module",
"start": "2011-10-12"
},
{
"end": "2012-03-03",
"cycle": "Other modules",
"start": "2011"
}
],
"analysis_unit": "Units of analysis were individuals, and institutions, including schools, public institutions, non-governmental organisations, and private firms in the formal and informal sectors.",
"geog_coverage": "The survey had national coverage"
},
"data_access": {
"dataset_use": {
"cit_req": "National Institute of Statistics of Rwanda. Rwanda National Manpower Survey 2011-2012 [dataset]. Version 1. Kigali: NISR [producer], 2012.[distributor], 2014.",
"contact": [
{
"uri": "htpp://www.statistics.gov.rw",
"name": "Principal Statistician, Research and Dissemination",
"email": "claude.nyirimanzi@statistics.gov.rw",
"affiliation": "NISR"
},
{
"uri": "htpp://www.statistics.gov.rw",
"name": "Data Processing Manager",
"email": "massoud.harerimana@statistics.gov.rw",
"affiliation": "NISR"
}
],
"conf_dec": [
{
"txt": "By downloading the data users agree to maintain the confidentiality of the data and data subjects.",
"form_no": "",
"form_uri": "",
"required": "yes"
}
],
"conditions": "Public use files, accessible to all"
}
},
"title_statement": {
"idno": "rwa-nisr-rnms-2011-2012-v1",
"title": "Rwanda National Manpower Survey 2011-2012",
"alternate_title": "RNMS 2011-2012"
},
"authoring_entity": [
{
"name": "National Institute of Statistics of Rwanda",
"affiliation": "Ministry of Finance and Economic Planning"
}
],
"series_statement": {
"series_name": "Labor Force Survey [hh/lfs]"
},
"version_statement": {
"version": "v1: Edited, anonymised dataset for public distribution.",
"version_date": "2014",
"version_notes": "This is version 1 of the dataset, released in March, 2014."
},
"production_statement": {
"copyright": "(c) 2012, National Institute of Statistics of Rwanda",
"producers": [
{
"abbr": "MIFOTRA",
"name": "Ministry of Public Service and Labour",
"role": "",
"affiliation": ""
}
],
"funding_agencies": [
{
"abbr": "GoR",
"name": "Government of Rwanda",
"role": "Funder"
}
]
}
}
},
"varcount": "1909",
"year_end": "2012",
"published": "1",
"thumbnail": null,
"link_study": null,
"year_start": "2011",
"link_report": null,
"total_views": "1525658",
"repositoryid": "central",
"data_class_id": null,
"link_indicator": null,
"data_class_code": null,
"remote_data_url": "",
"total_downloads": "38800",
"authoring_entity": "National Institute of Statistics of Rwanda",
"data_access_type": "public",
"data_class_title": null
},
"access_type": "public",
"remote_data_url": null
}